为了保证潜水排污泵的正常使用和使用寿命,应定期进行检查和维护:
In order to ensure the normal use and service life of submersible sewage pumps, regular inspection and maintenance should be carried out.
1、更换密封环:在水介质中长期使用后,叶轮与密封环之间的间隙可以增加,从而降低了泵的流量和效率,应关掉开关,提升泵,拆下底盖,取下密封环,根据叶轮口环密封环的实际尺寸,间隙一般在0.5mm。
1. Replacement of sealing rings: After long-term use in water medium, the gap between impeller and sealing rings can be increased, which reduces the flow and efficiency of pumps. Switches should be turned off, pumps should be lifted, bottom cover removed and sealing rings removed. According to the actual size of the sealing rings of impeller orifice, the gap is generally 0.5mm.
2、潜水排污泵长期放置,清洗时应放在通风干燥处,注意防冻液。如果放在水里,至少15天运行30min(不能干磨),以检查其功能和适应性。
2. Submersible sewage pumps should be placed for a long time. When cleaning, they should be placed in a ventilated and dry place. Antifreeze fluid should be paid attention to. If placed in water, run for 30 minutes (not dry grinding) for at least 15 days to check its function and adaptability.
3、电缆检查一年至少一次,如果损坏,请给更换。
3. Cable inspection at least once a year. If damaged, please replace it.
4、至少一次检查电机的绝缘和紧固螺钉,如果电机绝缘,请与本公司售后服务部门联系,如果紧固螺钉松动,请重新拧紧。
4. Check the insulation and fastening screw of the motor at least once. If the motor is insulated, please contact our after-sales service department. If the fastening screw is loose, please tighten it again.
5、潜水排污泵在出厂时已注入适量的油,用于润滑机械密封,应每年检查一次油。如果有水在油中,应放开,更换机油,更换垫片,拧紧插头。三周后,有必要重新检查,如果油和乳液,机械密封应检查,如果必要的话,应更换(与该公司的售后服务部门)。
5. Submersible sewage pumps have been injected with appropriate amount of oil when they leave the factory to lubricate mechanical seals. Oil should be inspected once a year. If there is water in the oil, it should be released, the oil should be replaced, the gasket should be replaced, and the plug should be tightened. After three weeks, it is necessary to re check. If the oil and emulsion, mechanical seal should be checked, if necessary, it should be replaced (with the company's after sales service department).
注:32 #油机械油。
Note: 32 # Oil Machinery Oil.
6、潜水排污泵运行故障后,请根据给定的故障排除方法排除,将得到解决,并不能确定原因,不拆维修,应立即与客户服务部门联系。
6. After the operation failure of the submersible sewage pump, please remove it according to the given www.jiaodaijiqi.cnwww.yanglaoyuann.cnwww.sjzbaojie.net.cnwww.wufengwantou.cn
www.wushuichulii.com.cnwww.wushuichul.com.cntroubleshooting method, which will be solved, and the cause can not be determined. Without disassembly and maintenance, the submersible sewage pump should contact the customer service department immediately.